Kiawah Island Schedule of Fees & Deposits
Please see memo for Vegetation Removal Review fees, deposit and permits effective September 27, 2022.
Please see memo for fee changes effective July 1, 2022
Fees
Single-Family Residential Review
- New Construction and Rebuilds: $120 per 100 square feet (heated, covered, and screened) or a $6,000 minimum.
- New Construction of Model Homes: $2,000 for each new home after initial design approval.
- Major Improvement: $3,000.
- Improvement: $1,000 for multi-item scope; $500 for single-item scope.
- Maintenance: $200
Commercial and Recreational Review
- New Construction: $40 per 100 square feet (heated, covered, and screened) or $10,000 minimum, whichever is greater.
- Major Improvement: $3,000.
- Improvement: $1,000 for multi-item scope; $500 for single-item scope.
- Maintenance: $200.
Multi-Family Residential Review
- New Construction: $40.00 per 100 square feet (heated, covered, and screened) or $10,000 minimum, whichever is greater.
- Major Improvement: $60.00 per 100 square feet (heated, covered, and screened) or $500 minimum, whichever is greater.
- Major Improvement (Multiple Units): $60.00 per 100 square feet (heated, covered, and screened) or $1,000 minimum, whichever is greater.
- Improvement: $3000 project-wide for multi-item scope; $2,000 project-wide for single-item scope; $1,000 for single unit multi-item scope; $500 for single unit single-item scope.
- Maintenance: $1,000 project-wide; $200 for single unit.
Vegetation Review
- $25 per palm removal.
- $50 per tree removal of 6″ or greater but less than 24″ in caliper.
- $100 per tree removal of 24″ or greater in caliper.
- $300 for dune pruning.
Signage Review
- $100.00 per sign type on application.
Construction or Design Change Review
- First Construction or Design Change: Fee Waived.
- Each Additional: $200.
Re-inspection (fee applies after second failed inspection)
- New Construction: $300.
- Major Improvement: $300.
- Improvement: $200 (multi- and single-item review).
- Maintenance: $100.
Deposits
New Construction Permit: $17,000 by the Property Owner and $15,000 by the Contractor. A combined check will only be accepted if the Property Owner and the Contractor are the same entity. $5,000 of the Contractor deposit will be considered the Foundation Deposit and $1,000 will be considered the Final Landscape Plan Deposit. A more substantial deposit or Letter of Credit will be required for larger commercial and multi-family projects, with the amount to be determined by the ARB at the time of application based on the scope.
Major Improvement Permit: $7,500 by the Property Owner and $7,500 by the Contractor. New Construction deposits apply when Major Improvements require demolition that approaches the scope of New Construction.
Improvement Permit:
- Multi-item Scope: $5,000.
- Single-item Scope: $2,500.
Maintenance Permit: $1,000.00.
Vegetation Permit: $1,000 when tree removal requires mitigation; $2,500 for dune pruning.
Construction or Design Change: If the scope of work modifies the permit type, additional deposits will apply.
Demolition Permit: $5,000 by the Property Owner and $5,000 by the Contractor.
Landscaping and Irrigation Budget:
Figure to be based on a minimum 2% of the construction budget and depending upon the amount of existing vegetation preserved during construction.
Fines*
Construction Sites
- Littered site: $500.
- No temporary sanitary facilities, or unscreened: $500.
- Contractor/Subcontractor misconduct: $500.
- Building equipment or material on right-of-way: $500.Damage to right-of-way: $500.
- Parking on adjacent property: $500.
- Building equipment or material on adjacent property: $500.
- Nonconforming job sign, or unapproved signage: $500.
- Unapproved burning: $5,000.
All Properties
- Damage to natural areas (minor): $2,500.
- Damage to natural areas (major): $12,500 and mitigation required.
- Unauthorized tree removal per inch of trunk diameter: $1,000/inch plus per-inch mitigation.
- Unauthorized tree pruning (minor): $2,500 per tree.
- Unauthorized tree pruning (major): $5,000 per tree and mitigation required (pruning of more than 25% of a tree will be considered a removal and fines assessed accordingly).
ARB Process
- Unauthorized plan change (minor, per item): $1,250.
- Unauthorized plan change (major, per item): $7,500.
- Failure to submit the New Home Final Landscape Plan prior to installation: $5,000.
- Working without a permit (Maintenance): $5,000.
- Working without a permit (Improvement): $12,500.
- Working without a permit (Major Improvement of New Construction): $100,000.
- Unauthorized finishes (paint, stain, roof material, etc.): Possible total deposit plus future permit hold
*NOTES
The ARB may assess fines on a case-by-case basis:
- Amounts listed are minimum fines.
- For tree removals or damages to natural areas, increases in proportion to impact will be assessed.
- For unauthorized tree or vegetation removals, fines may be increased to reflect contractor non-compliance with permitting requirements.
- Fines may be levied daily, weekly, or monthly as warranted.
- Fines are subject to periodic increases at the sole discretion of the ARB.
